We Deliver Real-Time Solutions
Client Type: Builder Team
Services Provided:
- Fire Pump Design
- Jurisdictional Approval
Background
A client requested an upgrade to a fire pump design with suppression system to increase the viability of an existing storage building. Pandemic-era supply chain issues would delay delivery of the chosen electronic component, postponing project completion.
Value Provided
With the client, FD Fire Design suggested switching to a readily available diesel-drive fire pump, and met with the architect, engineer, and construction team to facilitate the transition. The client responded quickly and the city approved the revised design. The available diesel pump was delivered on time, allowing the system to be installed, inspected, and operational within the client’s original required timeline.
Results
FD Fire communicated and worked closely with people from all parts of the project, from manufacturers and engineers to installation teams. This communication and work were pillars to a successful outcome.